They have scrapped the whole project, I don't know why they don't just work on bits of it at a time to complete what they set out to do in the first place. The railway will be more expensive to travel on to get to Birmingham, only a 30 min cut in travelling time, and it doesn't even travel into London. Its just a waste of public spending. I don't know why I'm so pissed off about this but I am. They have cleared vast amounts of natural areas, causing damage to wildlife and natural reserves. The whole of the area around Euston is a building site, and have seen them working on it for about 5 years now, and I feel they probally knocked down parts of listed london, like buildings, old streets. I think they should stick with the original plan and do it well, not quickly, if they can't do it effectively whats the point.